Reference: ACCT 311 course site ↗
Read the evidence.
Make the decision.
Practice interpreting distributions and regression output, then use Excel to solve three business cases.
The statistical exhibits are synthetic teaching examples. This is a local review copy.
Your workbook
Download the workbook. Complete the labeled Goal Seek and Solver templates using the given values, then complete the scenario analysis in desktop Excel. Enter your answers on this page. You do not need to submit the workbook for this study guide. Round numerical answers to two decimal places unless whole units are requested.
Download Excel workbookStudent information
Invoice collection time
Reference: Module 5.1 — Statistics concepts ↗
Each observation is one invoice; collection time is measured in days. In Excel’s Histogram output, Bin is the upper limit. Bin 20 counts times above 10 and up to 20 days. More counts times above the final bin limit.
| Bin (days) | Frequency |
|---|---|
| 10 | 8 |
| 20 | 13 |
| 30 | 4 |
| 40 | 1 |
| 50 | 2 |
| 60 | 1 |
| 70 | 0 |
| 80 | 1 |
| More | 0 |
| Statistic | Value |
|---|---|
| Count | 30 |
| Mean | 20.77 |
| Median | 15.50 |
| Standard Deviation | 16.52 |
| Standard Error | 3.02 |
| Confidence Level (95.0%) | 6.17 |
Compare service teams
Reference: Module 5.2 — Excel statistics ↗
Interpret the vertical box-and-whisker chart. The line inside each box is the median; the box contains the middle 50% of the observations. Separate dots mark unusual observations. Values are labeled directly on the chart.
Explain the regression output
Reference: Module 5.2 — Regression in Excel ↗
Outcome: Service cost ($). One observation is one service week. Both models use the same 40 observations. Observed technician hours range: 10–50. Observed urgent jobs range: 0–7. Use α = 0.05 for significance questions.
Simple model
| Regression statistics | Value |
|---|---|
| Multiple R | 0.95 |
| R Square | 0.90 |
| Adjusted R Square | 0.90 |
| Standard Error | 179.56 |
| Observations | 40 |
| ANOVA | df | SS | MS | F | Significance F |
|---|---|---|---|---|---|
| Regression | 1 | 11,028,229.97 | 11,028,229.97 | 342.03 | 1.35e-20 |
| Residual | 38 | 1,225,248.49 | 32,243.38 | ||
| Total | 39 | 12,253,478.45 |
| Term | Coefficient | Std. Error | t Stat | P-value | Lower 95% | Upper 95% |
|---|---|---|---|---|---|---|
| Intercept | 437.16 | 65.64 | 6.66 | 7.124e-08 | 304.27 | 570.04 |
| Technician hours | 41.74 | 2.26 | 18.49 | 1.35e-20 | 37.17 | 46.31 |
Multiple model
| Regression statistics | Value |
|---|---|
| Multiple R | 0.99 |
| R Square | 0.97 |
| Adjusted R Square | 0.97 |
| Standard Error | 98.52 |
| Observations | 40 |
| ANOVA | df | SS | MS | F | Significance F |
|---|---|---|---|---|---|
| Regression | 2 | 11,894,338.40 | 5,947,169.20 | 612.70 | 4.361e-29 |
| Residual | 37 | 359,140.05 | 9,706.49 | ||
| Total | 39 | 12,253,478.45 |
| Term | Coefficient | Std. Error | t Stat | P-value | Lower 95% | Upper 95% |
|---|---|---|---|---|---|---|
| Intercept | 180.00 | 45.15 | 3.99 | 0.0003029 | 88.52 | 271.48 |
| Technician hours | 42.00 | 1.24 | 33.91 | 1.803e-29 | 39.49 | 44.51 |
| Urgent jobs | 65.00 | 6.88 | 9.45 | 2.118e-11 | 51.06 | 78.94 |
Prediction case: Technician hours = 30; Urgent jobs = 3. Actual outcome = 1,775.00. Use the multiple model for this case.
Brightline Print Studio · target profit
Reference: Module 5.3 — Goal Seek, Solver & Scenarios ↗
Complete this task in Excel · Goal Seek
- Open your downloaded Excel workbook. If you have not downloaded it yet, use the single download button on the Start page.
- Open the Goal Seek worksheet. In desktop Excel, build the model from the given assumptions and use Goal Seek to find the required input.
- Return to this page and enter your results and interpretation answers below.
This workbook is for practice. You do not need to upload it to Canvas.
Brightline sells printed display packages. The fixed assumptions are listed below and in the workbook. Design your own Excel model, then use Goal Seek to find the sales volume needed to reach the profit target. Evaluate whether the plan meets the capacity limit. Packages must be sold in whole units.
| Input | Value |
|---|---|
| Price per unit ($) | 48 |
| Variable cost per unit ($) | 19 |
| Fixed costs ($) | 7250 |
| Target profit ($) | 6000 |
| Maximum units | 450 |
Summit Display Kits · product mix
Reference: Module 5.3 — Goal Seek, Solver & Scenarios ↗
Complete this task in Excel · Solver
- Open your downloaded Excel workbook. If you have not downloaded it yet, use the single download button on the Start page.
- Open the Solver worksheet. In desktop Excel, build the model from the given assumptions and use Solver to find the best production mix.
- Return to this page and enter your results and interpretation answers below.
This workbook is for practice. You do not need to upload it to Canvas.
Complete the labeled Excel template using the fixed assumptions below. Use Solver to recommend a product mix. Decide which cells represent the decision, the objective, and each constraint. Keep the solution, save the Solver settings, and create an Answer Report as evidence.
| Per unit | Standard | Deluxe |
|---|---|---|
| Contribution ($) | 40 | 65 |
| Labor hours | 2 | 4 |
| Material units | 3 | 2 |
| Demand cap | 50 | 35 |
Available: 160 labor hours and 150 material units. Choose nonnegative whole-unit quantities to maximize total contribution. No additional fixed cost changes with the mix.
Meadow Event Rentals · alternative assumptions
Reference: Module 5.3 — Goal Seek, Solver & Scenarios ↗
Complete this task in Excel · Scenario Manager
- Open your downloaded Excel workbook. If you have not downloaded it yet, use the single download button on the Start page.
- Open the Scenarios worksheet. In desktop Excel, create the specified scenarios with Scenario Manager and generate a Scenario Summary.
- Return to this page and enter your results and interpretation answers below.
This workbook is for practice. You do not need to upload it to Canvas.
Use the Scenarios worksheet. Store all three named scenarios using units, price, and variable cost as changing cells. Generate an actual Scenario Summary with profit as the result cell. Fixed cost is $12,000; target profit is $6,000. Save the scenarios and the generated summary.
| Scenario | Units | Price ($) | Variable cost ($) |
|---|---|---|---|
| Base | 800 | 40 | 17 |
| Strong demand | 1000 | 39 | 18 |
| Cost pressure | 750 | 40 | 22 |
Reference: ACCT 311 course site ↗
Review your answers
0 of 36 questions answered.
Unanswered: M01 M02 M03 M04 M05 M06 M07 M08 M25 M09 M10 M11 M12 M13 M14 M15 M16 M18 M20 M21 M22 G01 G02 G03 G04 S01 S02 S03 S04 S05 S06 C01 C02 C03 C04 C05
The answer key and animated Excel solutions are always available through Solutions above. The workbook is for practice and does not need to be uploaded.
Your preliminary practice score is out of 25.
Local review copy. Use Check practice locally to review your answers.
Reference: ACCT 311 course site ↗
Answer key & Excel solutions
The answer key and worked solutions are always available. The instructor solution workbook includes the original screenshots, Solver Answer Report, and Scenario Summary. No submission or password is needed.